XP Maintenance completed corrosion control work on seven overhead gantry cranes at a mining operation in Western Australia’s Pilbara region. All seven were returned to the client with first-pass QA/QC sign-off and no rework.
The work was the first phase of a 12 crane project. The cranes sit more than 50 meters above the ground, and the team had to plan around coating temperature limits and nearby electrical and mechanical equipment sensitive to abrasive media.
Why use us
XP Maintenance covers the full spectrum, from initial inspections and recommendations through to project planning and execution.
XP Maintenance is certified to ISO 9001 (Quality Management) and ISO 45001 (Occupational Health and Safety), so you can trust that our work meets recognised quality and safety standards. We work alongside our clients and develop processes for technically challenging projects, the kind many providers shy away from, and our team of critical thinkers thrives on.
The challenge
The overhead gantry cranes project is technically demanding. It covers 12 overhead gantry cranes situated more than 50 metres above ground level, with beam spans more than 20 metres. Corrosion is visible on all walking and work platforms, handrails, beams and blocks.
Several factors had to be considered, including working at heights, environmental exposure, and electrical and mechanical systems that are sensitive to abrasive media such as garnet. Simpler constraints such as power, water and space also needed careful planning.
When XP Maintenance was asked to review the project, we knew we could deliver it. We were confident that detailed planning and a clear understanding of the client’s requirements would overcome the challenges.
Before and after photos, showing the work completed.
Strict QA/QC requirements were essential to ensure that the client’s requirements and the product recommendations were met.
XP Maintenance worked closely with industry leaders who sourced and supplied the primer and paints. This relationship allowed us to plan, design and execute the work on 7 of the 12 cranes so that key application recommendations did not become constraints.
One example is the maximum surface temperature at which application can proceed. Anyone who has worked in the Pilbara region of Western Australia understands its environment and seasons, which were a key consideration when planning our work windows to achieve that one of many considerations.
All 7 cranes were returned to the client under time, without delays or rework, and with full QA/QC sign-off first time, every time. We also know that no job is a success unless you have Zero harm or incidents, so it was a success on all fronts.
With temperatures rising, work on the remaining 5 cranes will continue in the new year to close out this project..
Contact us
Planning corrosion control work on cranes or other fixed plant? Contact Josh Rochford to discuss the scope, site constraints and work windows.